Sunday, 1 December 2013

Journal - Production Plan (First Day of Shooting)

Since we have finished our storyboards and our animatic, we decided to set out our plans for production.

The majority of our music video takes places in London and we are hoping to shoot this all on the same day for practicality and continuity reasons, though have not currently set a date for this. We were hoping to film in London on Saturday 14th and/or Sunday 15th December, but some of our actors are unavailable at this date and so we have had to postpone this until further notice.

We have acknowledged that we will need to consider weather conditions when shooting in London, and so shooting can easily be postponed. Some of the locations of our shots, however, (the arcade, train station, underpass graffiti area) can still be shot even if it is raining however the shots of various London landmarks may need to be rescheduled.

As the location is the most practical of our whole shoot, we decided to shoot this first. We have no concerns for weather etc as the location of the shoot is inside, at my group partner's house, as all we need is a white wall, bedroom, window ledge and a mirror.

Below is our  production plan for the first day of shooting for our music video.



The costume we have chosen for this portion of our music video consists of a skirt and crop top [current trends] to help communicate the importance of fashion in our image. Some of this shoot will also feature Isla with red lipstick, a bowler hat and a red flower crown.



No comments:

Post a Comment